{"id":145952,"date":"2025-05-30T15:09:50","date_gmt":"2025-05-30T06:09:50","guid":{"rendered":"https:\/\/www.allway-japan.com\/travelpost\/%e7%80%ac%e6%88%b8%e5%a4%a7%e6%a9%8b\/"},"modified":"2025-05-30T15:09:50","modified_gmt":"2025-05-30T06:09:50","slug":"%e7%80%ac%e6%88%b8%e5%a4%a7%e6%a9%8b","status":"publish","type":"travelpost","link":"https:\/\/www.allway-japan.com\/en\/travelpost\/145952\/","title":{"rendered":"Seto Ohashi"},"content":{"rendered":"<p class=\"has-small-font-size\"><img decoding=\"async\" src=\"https:\/\/oss.allway-japan.com\/wp-content\/uploads\/2025\/05\/SI_80033792_47939.jpg\"\/><\/p>\n<p class=\"has-small-font-size\">The information provided reflects the details available at the time of the survey.<br \/>Please note that facility details may change due to the facility\u2019s circumstances, so please check for the latest information before visiting.\nThis content has been translated using machine translation.<\/p>\n<p class=\"has-small-font-size\">Information provided by: JTB Publishing<\/p>\n<p class=\"has-small-font-size\">This content uses automatic translation services. Automatic translations may not always be accurate.<br \/>Please note that the translated content may differ from the original meaning. We ask for your understanding when using this content.<\/p>","protected":false},"excerpt":{"rendered":"<p>Of the three routes of the Honshu-Shikoku cross-country bridge, the first road railway combined bridge was completed in 1988. The upper section is the Seto Ch\u016bdo, and the lower section is the JR Setohashibashi Line. The six bridges that connect Kojima to Sakade, which travel through Hitsuishi Island, Iwaguro Island, Hasa Island, Yoshima, and Mitsuko Island are the Shimotsui Setodai Bridge (suspension bridge), the twin bridge of the Takaishi Island Bridge and Iwaguro Island Bridge (both cable-stayed bridge), the Yoshima Bridge (truss bridge), the Kitabisan Seto Bridge, and the Nanabisan Seto Bridge (both suspension bridges). The construction period is nine years and six months, with a total cost of 1,133.8 billion yen. The total length of 12.3km, of which the marine area is 9.4km. If you want to cross the bus by bus, you can transfer from Kojima Station to Yoshima via the Shimoda Bus Yoshima Daini parking lot, and the Kotosan bus runs between Yoshima and Sakaide stations.<\/p>","protected":false},"author":9,"featured_media":78442,"template":"","meta":{"_acf_changed":false},"categories":[75],"tags":[],"class_list":["post-145952","travelpost","type-travelpost","status-publish","has-post-thumbnail","hentry","category-spot"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.allway-japan.com\/en\/wp-json\/wp\/v2\/travelpost\/145952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.allway-japan.com\/en\/wp-json\/wp\/v2\/travelpost"}],"about":[{"href":"https:\/\/www.allway-japan.com\/en\/wp-json\/wp\/v2\/types\/travelpost"}],"author":[{"embeddable":true,"href":"https:\/\/www.allway-japan.com\/en\/wp-json\/wp\/v2\/users\/9"}],"version-history":[{"count":0,"href":"https:\/\/www.allway-japan.com\/en\/wp-json\/wp\/v2\/travelpost\/145952\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.allway-japan.com\/en\/wp-json\/wp\/v2\/media\/78442"}],"wp:attachment":[{"href":"https:\/\/www.allway-japan.com\/en\/wp-json\/wp\/v2\/media?parent=145952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.allway-japan.com\/en\/wp-json\/wp\/v2\/categories?post=145952"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.allway-japan.com\/en\/wp-json\/wp\/v2\/tags?post=145952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}